3

Affiliate Section

3KW ON GRID System

SKU :


  • Applicable For : West Bengal.
  • The above price is after applying subsidy.

Solar Module Detail: 

  • Make : Alpex / Jakson/Sova or Equivalent
  • Wattage of each module : 250 watt
  • Number of Module :12

Inverter Detail: 

  • Make : Zever/Jakson / Polycab/Growatt or Equivalent.
  • Total KW : 3 KW

Balance of System: 

  • GI Structor :Sikco.
  • AJB with SPD type-2 protection: Mersen/ Bussman/ Eqvivalent.
  • Earthing :Gravin/Sabo or equivalent
  • Connector : Elmex or Equivalent
  • DC cable  : Polycab
  • AC cable  : Polycab
  • Payment Terms: 
  • 20% with PO
  • 70% on dispatch
  • 10% on installation
  • System cost includes : Installation Cost, Transportation cost.
  • Terms and Condition : Mobilisation of work after 14 days of realization of 20% of the payment.Standard terms and condition apply.
  • Client will provide all the requisite documentation for net metering connection.
  • * – Net meter cost will be separate.Net metering charges are also extra & prescribed by Electricity Regulatory commission (autonomous body of state govt) and paid to local area discom.

Please see the video for demonstration:

download1

Pay Only 10% NOW

Rest On Despatch

+91 8882210166 for Assistance

Check serviceability and payment options at your location.

Want more than 5 quantity of this product? Get price click here


Product Description

Solar Module Detail: 


  • Make : Alpex / Jakson/Sova or Equivalent

  • Wattage of each module : 250 watt

  • Number of Module :12


Inverter Detail: 

  • Make : Zever/Jakson / Polycab/Growatt or Equivalent.

  • Total KW : 3 KW


Balance of System: 

  • GI Structor :Sikco.

  • AJB with SPD type-2 protection: Mersen/ Bussman/ Eqvivalent.

  • Earthing :Gravin/Sabo or equivalent

  • Connector : Elmex or Equivalent

  • DC cable  : Polycab

  • AC cable  : Polycab



  • Payment Terms: 

  • 20% with PO

  • 70% on dispatch

  • 10% on installation



  • System cost includes : Installation Cost, Transportation cost.



  • Terms and Condition : Mobilisation of work after 14 days of realization of 20% of the payment.Standard terms and condition apply.

  • Client will provide all the requisite documentation for net metering connection.

  • * - Net meter cost will be separate.Net metering charges are also extra & prescribed by Electricity Regulatory commission (autonomous body of state govt) and paid to local area discom.


Sold by : IGSSBWB

₹ 149,956.00 price_including_tax

EMI Available
Credit Available
Apply Now
Duration Interest % Emi Per Month
3 months 13% Rs.51073/-
6 months 13% Rs.25949/-
9 months 13% Rs.17578/-
12 months 13% Rs.13394/-
Quantity
+
MOQ - 1 Piece

Sell similar items as Vendor

Need help? Call on
+91-8882210166

Document
Newsletter Signup