10

Affiliate Section

9KW ON GRID System

SKU :


  • Applicable For : Delhi.
  • Technological advancements in our offer:

1. 5BB cell in solar modules against 3BB and 4BB offered in the market.
2. Anti Dust coating on solar modules
3. Real time data monitoring via smartphone app.

Solar Module Detail: 

  • Make : Sunfuel / Waaree / Navitas / HHV
  • Wattage of each module : 250 watt- 315 watt ( As per site requirement )

Inverter Detail: 

      • Make : PowerOne / Phocos / Growatt / SAJ.

Balance of System: 

  • Earthing : As per site requirement
  • Lighting Areester : JMV
  • DC cable  : Havells / Kalinga
  • AC cable  : Havells / Kalinga
  • Payment Terms: 
  • 20% with PO
  • 70% on dispatch
  • 10% on installation
  • System cost includes : Installation Cost, Transportation cost.
  • Terms and Condition : Mobilisation of work after 14 days of realization of 20% of the payment.Standard terms and condition apply.
  • Client will provide all the requisite documentation for net metering connection.
  • * – Net meter cost will be separate.Net metering charges are also extra & prescribed by Electricity Regulatory commission (autonomous body of state govt) and paid to local area discom.

Please see the video for demonstration:

download1

Connect With Your Local Dealer

Be Our Franchise



Pay Only 10% NOW

Rest On Despatch

+91 8882210166 for Assistance

Check serviceability and payment options at your location.

Want more than 5 quantity of this product? Get price click here


Product Description

Solar Module Detail: 


  • Make : Sunfuel / Waaree / Navitas / HHV

  • Wattage of each module : 250 watt- 315 watt ( As per site requirement )


Inverter Detail: 



      • Make : PowerOne / Phocos / Growatt / SAJ.




Balance of System: 


    • Earthing : As per site requirement

    • Lighting Areester : JMV

    • DC cable  : Havells / Kalinga

    • AC cable  : Havells / Kalinga



    • Payment Terms: 

    • 20% with PO

    • 70% on dispatch

    • 10% on installation



    • System cost includes : Installation Cost, Transportation cost.



    • Terms and Condition : Mobilisation of work after 14 days of realization of 20% of the payment.Standard terms and condition apply.

    • Client will provide all the requisite documentation for net metering connection.

    • * - Net meter cost will be separate.Net metering charges are also extra & prescribed by Electricity Regulatory commission (autonomous body of state govt) and paid to local area discom.



Sold by : IGSSUND

₹ 476,280.00 price_including_tax

EMI Available
Credit Available
Apply Now
Duration Interest % Emi Per Month
3 months 13% Rs.162213/-
6 months 13% Rs.82417/-
9 months 13% Rs.55828/-
12 months 13% Rs.42541/-
Quantity
+
MOQ - 1 Piece

Sell similar items as Vendor

Need help? Call on
+91-8882210166

Document
Newsletter Signup